It is the cache of ${baseHref}. It is a snapshot of the page. The current page could have changed in the meantime.
Tip: To quickly find your search term on this page, press Ctrl+F or ⌘-F (Mac) and use the find bar.

The Effect of the Workload on Due Date Performance in Job Shop Scheduling | Santoro | Brazilian Journal of Operations & Production Management

Brazilian Journal of Operations & Production Management, Vol 5, No 1 (2008)

Font Size:  Small  Medium  Large

The Effect of the Workload on Due Date Performance in Job Shop Scheduling

Miguel Cezar Santoro, Marco Aurélio Mesquita, de

Abstract


This paper provides a simulation model to study the effect of the work-in-process control on due date performance in job shop environment. The due date performance is measured by both the number of tardy jobs and the total tardiness. The simulation runs include different shop configurations (flow shop and general job shop), workloads and sequencing rules. As expected, the results reveal that due date performance is highly dependent on the work-in-process, particularly after the system reaches saturation. Nevertheless, the model is very useful to show job shop managers the effect of the work-in-process control in the due date meeting performance.

Full Text: PDF

Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

 

--

Brazilian Association for Industrial Engineering and Operations Management (ABEPRO)

Av. Almirante Barroso, Nº 63 - Sala 417 - Centro - Rio de Janeiro - RJ - BRASIL - CEP: 20031-003

Todos os direitos reservados © 2008 - ABEPRO - Melhor visualizado no Internet Explorer 5.5 ou superior