It is the cache of ${baseHref}. It is a snapshot of the page. The current page could have changed in the meantime.
Tip: To quickly find your search term on this page, press Ctrl+F or ⌘-F (Mac) and use the find bar.

HEURISTICS FOR MINIMIZING THE NUMBER OF TARDY JOBS ON A SINGLE MACHINE WITH RELEASE TIME | Oyetunji | The South African Journal of Industrial Engineering

HEURISTICS FOR MINIMIZING THE NUMBER OF TARDY JOBS ON A SINGLE MACHINE WITH RELEASE TIME

E. O. Oyetunji, A. E. Oluleye

Abstract


ENGLISH ABSTRACT: This paper considers the problem of minimizing the number of tardy jobs with release time on a single machine. Given that the problem has been classified as strongly NP-Hard, three heuristics (EOO, HR2, and HR3) are proposed for this problem. They are compared with a heuristic by Dauzere-Perez (selected from the literature). Randomly-generated problems ranging from 3 to 500 jobs are solved. Experimental results show that one of the proposed heuristics (EOO) outperforms other heuristics, both in terms of quality of solution (effectiveness) and speed of execution (efficiency).

AFRIKAANSE OPSOMMING: Die navorsing behandel die ministering van voltooiingstyd van die aantal draaltake by ‘n enkele werktuig. As aanvaar word dat die problem geklassifiseer word as hoofsaaklike NP-hard, word voorgestel dat die vraagstuk bestudeer word deur gebruik te maak van drie heuristiese metodes (EOO, HR2, HR3). Die metodes word vergelyk ten opsigte van vertoning met die Dauzere-Perez-metode. Toevalsgegenereerde probleme wat strek vanaf 3 tot 500 draaltake word behandel. Die eksperimentele werk lewer bewys dat die EOO-metode ander metodes die loef afsteek ten opsigte van oplossingsgoedheid en –snelheid.


Full Text:

PDF